Nonhyun Center
Fire protecion systems Centralized Monitoring of each systems

D-MUX 3000 R type for fire monitoring system

HALON & NAFS-¥² gas suppression systems

Early fire detection with smoke and heat detectors cross-wired

Fireproof wall and floor
Electric supplying systems Dual power feeds from KEPCO

High efficiency Transformer with enough capacity for dual backup

Reliable gas turbine with fuel more than 24 hour running capacity

Parallel Static UPS operation

Battery Back-Up Time : 1hr
Mechanical
systems
Optimal temperature at 20~23¡É (68.0~73.4¢µ) & humidity of 40-50%

Down-flow type CRAC for cooling of server rooms

Dual cooling water pipe for redundancy

Reilable inverter control of Cooling towers

N+1 isolated configuration of cooling towers and pumps

Water detection system, water dam around pipe and drain holes
Security service
& systems
RF card key
  (Access Control & alarming)

Full interior and exterior security surveillance, monitoring and
  recording of activities