| Fire protecion systems |
 |
Centralized Monitoring of each systems

Early fire detection with smoke and heat detectors cross-wired

Fireproof wall and floor

NAFS-¥² gas suppression system |
 |
| Electric supplying systems |
 |
Diesel generating systmes

Parallel Static UPS operation

Battery Back-Up Time : 1hr |
 |
Mechanical systems |
 |
Optimal temperature at 20~23¡É (68.0~73.4¢µ) & humidity of 40-50%

Down-flow CRAC for cooling of server rooms

Dual cooling water pipe for redundancy

N+1 isolated configuration of cooling towers and pumps

Water detection system, water dam around pipe and drain holes
|
 |
Security service & systems |
 |
RF card key (Access Control & alarming)

Full interior and exterior security surveillance, monitoring and recording of activities

3 shifts of on-site security personnel are on duty 24/7/365
|
 |